Take a look at our Rio Tinto case study and webinar, to learn more about creating a safety loop that incorporates a critical risk management (CRM) program underpinned by the bow-tie analysis method.

7 Critical Control Program Tips

  1. Don’t invent — just implement.
  2. Reduce Complexity, don’t multiply it.
  3. Make it easier
  4. Ask the operators what is important
  5. Faster rollout = faster learnings
  6. Metrics and mind
  7. Believe it